Leave a Message

Thank you for your message. We will be in touch with you shortly.

Explore Our Properties
The Carousel Sign Still Turns Slowly: What Actually Changed At Cambrian Park Plaza In 2026

The Carousel Sign Still Turns Slowly: What Actually Changed At Cambrian Park Plaza In 2026

If you drive Camden or Union on a Tuesday morning, the plaza looks the same as it did in 2019. The yellow sign with the carousel on top still marks the corner. The covered walkway still runs past storefronts that have been there for decades. The parking lot is still mostly empty by mid-afternoon.

The paperwork tells a different story. In February, the owner of Cambrian Park Plaza filed to change the sequence of a project the City Council approved almost four years ago, and that quiet procedural move is the most consequential thing to happen at Union and Camden this year.

What the February filing actually asked for

The site is owned by Weingarten Nostat, Inc., an entity that moved under the Kimco umbrella after Kimco Realty acquired Weingarten Realty. On February 13, 2026, Kimco's Michael Strahs submitted a Planned Development Permit Amendment, labeled PDA20-007-01, with a first comment letter due on March 28, 2026, and the City of San José opened public review with Laura Meiners assigned as planner.

The amendment is not a redesign. City records describe it as a Planned Development Permit Amendment to implement a phasing plan, with no changes to land use, number of residential units, or total square footage of commercial use proposed. The important word there is phasing. As KQED reported in April, the developer applied to alter the permit so they can build the housing part of the plan first and extend the permit up to 4 years in the process. The current entitlement was set to expire in 2028.

Housing first. Everything else later. Same units on paper, different order in the ground.

The plan the amendment would reshuffle

The version approved in 2022 was ambitious for a corner that, until now, has meant a dry cleaner and a covered walkway. The site is 18 acres at Camden and Union avenues, being reimagined as Cambrian Village with retail, restaurants, a hotel, 305 apartments, 48 single-family homes with 27 granny flats, 25 townhomes and a senior living center. San José Spotlight's summary of the 2022 approval fills in the rest:

  • Roughly 305 apartments, a 229-room hotel, a 110-bed assisted living facility and 50 senior independent living residences, with the well-known carousel sign retained and placed along Union Avenue
  • About 51,000 square feet of retail or restaurant space on the ground floor of the apartment building
  • Four acres set aside as public open space, with a commitment that farmers markets and short-term Christmas tree farms could keep using it
  • Relocation assistance for any businesses leasing at the shopping center that have been there since 2015 or earlier

The point of all of that, from the Council's perspective, was captured by District 9 Councilmember Pam Foley, who called the site "an underutilized piece of property that sorely needs revamping" and framed the finished village as a walkable place where families could meet friends without getting in a car.

A housing-first phasing plan does not delete any of that. It defers it. And in a project where the retail, hotel, and public open space are the reasons neighbors accepted the density in the first place, the order of operations is the whole argument.

Why the pencil stopped working

The reason the sequence changed is not a mystery. It is the same reason large mixed-use projects across the Bay Area have stalled or been redrawn.

Kelly Snider, a development consultant who also teaches at San José State, told KQED bluntly that "the plan that you can look through on the city's website is not economically feasible to build." Hoodline, summarizing the same reporting, noted that rising interest rates, high construction costs and shifting retail habits have left large mixed-use projects across the Bay Area stalled, redesigned or both, and Cambrian Park is caught in that same headwind.

Read that against the entitlement itself. The approved permit covers a hotel, an assisted living building, senior independent living, ground-floor retail, and for-sale housing on the same 18-acre pad. Each of those product types has a different capital source, a different construction timeline, and a different appetite for 2026 interest rates. Apartments are the one line item where the underwriting still works with rents that already exist in the market. Everything else has to be sold to a partner who does not exist yet at a price the current cost of capital will support.

That is what "phasing" actually means here. It means the developer wants to build the piece that pencils, keep the entitlement alive while the market for the rest recovers, and buy up to four more years of runway.

What residents were told to picture, and what they picked

The community input on this project was unusually specific. Peter Clarke of Friends of Cambrian Park summarized the ask to KQED in the plainest possible terms: the community was very clear that they wanted a place people would come to linger at, that had sit-down dining, not more fast food, something like The Pruneyard in Campbell or Los Gatos' downtown.

Those two comparison points matter. The Pruneyard is a shopping center that reads as a small downtown because it was retrofitted with a hotel, sit-down restaurants, and a walkable spine. Downtown Los Gatos is a working main street with two-story buildings, ground-floor retail, and residents living within a five-minute walk. Cambrian residents did not ask for apartments with a coffee shop underneath. They asked for the retail, the hotel, and the plaza that give a place a reason to linger. In the approved plan, the housing was the mechanism that paid for the rest.

Clarke's warning to KQED lands harder in that context. He told the outlet that once you put up housing on any piece of commercial land, it's never going to be commercial again, and if that happens, the neighbors' dream of a central gathering spot will never come to be. Whether that is the actual risk or a worst-case reading depends on how tightly the city ties the retail and hotel components to later phases of the permit. That is the part worth watching between now and the amendment's public comment cycle.

The covered walkway is still doing business

While the city reviews the amendment, the plaza itself keeps operating. That fact gets lost in every rendering that shows the site as a hole in the ground.

Heartbeat Cafe, run by Jolanta Kobylinski, opened in 1996 and is still under the covered walkway. It is one of the tenants that would qualify for the relocation assistance built into the 2022 conditions of approval, because the cutoff was any lessee in place since 2015 or earlier. The 1953 carousel sign at the corner, which received historic status in 2016, is not going anywhere either. It was designed into the approved plan to be reset along Union Avenue between the apartments and a senior residence, and no version of the phasing amendment changes that.

If you already shop or eat there, none of the current headlines require you to do anything different this summer. The 2028 permit expiration is the real deadline that pressures the timeline, and only if the amendment does not extend it.

The thesis, in one paragraph

The story most people tell about Cambrian Park Plaza is a story about delay. That is not quite the right frame. The story is about sequence. A project designed as a walkable district paid for by apartments has been asked, mid-stream, to become apartments now with a walkable district promised for later. Those two outcomes look identical on a spreadsheet and completely different from the sidewalk. For a resident who bought a home nearby partly on the premise that Camden and Union would eventually feel like the Pruneyard, the March 28 comment letter and the hearings that follow it are the moment the difference between those two outcomes gets decided. The carousel is still on the sign. What runs underneath it is still being negotiated.

If you own in Cambrian and you want a clear read on how this specific project, and the wider set of Union-Camden-adjacent variables, sits inside your own timeline for staying, upsizing, or selling, Georgia Phillips Realty is happy to sit down and work through the data with you. Schedule a personalized consultation and we will map it to the move you are actually considering.

Work With Georgia

Choosing the right real estate agent makes all the difference. With Georgia’s hands-on approach, proven strategies, and unwavering commitment, you’ll have the partner you need to achieve real estate success in San Jose.

Follow Me on Instagram